We will be performing a minor release for Smart Construction Simulation, including several feature improvements and bug fixes.
Please refer to the details below and the attached document for more information.
Maintenance Schedule
Tuesday, July 7, 2026, 18:00–20:00 (JST)
Due to system maintenance, the affected services will be unavailable during the above period.
Please note that the maintenance window may change depending on the progress of the work.
Release Details
Earthwork Simulation
- Improved the schedule editor to preserve the IFC display state while editing the schedule.
- Fixed an issue where dump trucks were displayed on non-working days in the schedule.
- Fixed an issue where coordinate values for projects using feet (ft) were incorrectly converted to meters (m) when exporting intermediate terrain as LandXML.
- Fixed an issue where changes to the swell/shrink factor (Factor C) were not reflected in the total earth volume displayed on the Area Settings screen.
Equipment Simulation
- Fixed an issue that prevented correct input of numbers with four or more digits when using locales with a period (.) as the decimal separator.
- Fixed an issue where dump trucks could incorrectly overtake other dump trucks waiting at traffic signals on shared routes.