We will perform a minor release for Smart Construction Simulation, including feature improvements.
Please refer to the information below and the attached document for details.
Scheduled Date and Time
Tuesday, July 21, 2026, 09:00 – 11:00 UTC
Due to system maintenance, the applicable services will be unavailable during the period above.
Please note that the maintenance window may change depending on the progress of the work.
Release Details
[Earthwork Sim]
- Added a feature to upload plans to Smart Construction Dashboard
- Fixed an issue where TINs outside the design area were generated when exporting intermediate terrain data in LandXML format
- Fixed an issue where a spinner was displayed when closing the layer editing screen without making any edits
- Fixed an issue where design data and quantity settings for optional tasks were reset when loading a plan
[Construction Equipment Sim]
- Fixed an issue where dump trucks generated from the dump start point would travel in reverse during parallel operation